Construction Update

Welcome to the City of Tucson Sun Link Streetcar Project Construction Update. If you have any questions or concerns, call the info line at 624-5656 to speak to a team member about the project.

This update is for the week of July 14, 2013.

NEW WORK ACTIVITIES

  • The contractor has completed 98% of the underground utility upgrades and relocations and 95% of the project has rail installed. Completed roadway sections for the Tucson Sun Link Streetcar include:
  • All of 2nd Street from Warren Avenue to Park Avenue
  • Park Avenue from 2nd Street to University Boulevard
  • University Boulevard from Park Avenue to 4th Avenue
  • 4th Avenue from University Boulevard to 9th Street
  • Congress Street from Toole Avenue to Granada Avenue
  • Broadway from Granada Avenue to 5th Street still needs final paving
  • Granada Avenue from Congress Street to Cushing Street still needs final paving
  • Avenida Del Convento from Cushing Street to Congress Street
  • Congress Street from Avenida Del Convento to Linda Avenue
  • Linda Avenue from Congress Street to Cushing Street

  • Cable wire is being installed all along the streetcar route, but impacts to traffic are minimal during this operation and usually only require parking or lane restrictions in the immediate area of the installation. Work is also being completed on the stops along the route some of which will have special art installations.

For a map of downtown traffic conditions please click here.

Following is detailed information for work from July 14, 2013 through July 20, 2013:

PLEASE NOTE: WEATHER RELATED IMPACTS MAY AFFECT SCHEDULED WORK ACTIVITIES

  • From 5 a.m. to 9 a.m. on Monday, July 15, 2013, the right lane of eastbound Speedway will be closed between Cherry and Warren Avenues. The closure allows the contractor to place a piece of equipment in the roadway that will facilitate a concrete pour for the Warren Avenue underpass.

  • During the Week of July 14, 2013, the contractor will continue installation and adjustments of the overhead contact wire along Congress Street and Broadway from Toole Avenue to Granada Avenue.
  • Motorists should expect lane restriction in the area.
  • Officers will be on site to direct traffic during this work.

  • During the month of July 2013, the contractor will continue installing traffic poles and signals, conduit, sidewalks, curb and access ramps along Broadway from Granada Avenue to Fifth Avenue. This work will be ongoing through the end of July, 2013.
  • Traffic may be shifted to accommodate work in the area.
  • Temporary turn restrictions at intersections may be in place during these activities.

  • A project unrelated to the Sun Link Tucson Streetcar project, is working along St. Mary's Road/Sixth Street, between Church Avenue and the westbound I-10 frontage road. Church Avenue at Sixth Street has been closed to allow the contractor to complete underground utility work.
    The following traffic control will be in place during this work:
  • North and southbound Church Avenue will be closed at Sixth Street to allow the contractor to complete underground sewer work. The closure is expected to be in place through the end of July 2013.
  • Main Avenue will be closed at its intersection with Sixth Street.
  • Work hours for the contractor are 6 a.m. to 4 p.m., Monday through Friday with occasional weekend work.
  • Motorists are asked to avoid using local neighborhood streets as a detour.

ONGOING WORK – ALL SECTIONS:

I-10 and West End of Line

This area of the project includes the west side of Interstate 10, Cushing Street under I-10 to Granada Avenue and Granada Avenue to Congress Street. Traffic control in this area is as follows:

  • ONGOING: Cushing Street, east of the westbound I-10 frontage road, has been re-opened. Cushing Street under I-10 will remain closed.

  • ONGOING: Cushing Street, between the eastbound I-10 frontage road west to Avenida del Palo Fierro, is closed to motorists.

  • ONGOING: The eastbound I-10 frontage road is reduced to one travel lane between Congress and Cushing Streets.
  • Access to the Congress Street I-10 on ramp will be maintained at all times.
  • Access to businesses along the eastbound I-10 frontage road will not be impacted.
  • The Cushing Street and I-10 underpass is closed to through traffic.

Downtown

This area of the project includes Congress Street and Broadway through downtown from Granada Avenue to 5th Avenue. Traffic control in this area is as follows:

Access to the many events and activities in the downtown area can be reached from the north by using Sixth Avenue; from the east by using Broadway or Barraza-Aviation Parkway; from the south by using Sixth Avenue; or from the west by using Congress Street and Broadway.

  • ONGOING: The existing traffic signals and foundations at the intersections of Church Avenue and Broadway and Stone Avenue and Broadway have been removed.
  • Temporary three-way stops will be in place while the new traffic signals are installed.
  • Officers will direct traffic during peak travel times.

  • ONGOING: The existing traffic signals and foundations at the intersection of Granada Avenue and Congress Street have been removed.
  • Temporary signals will be in place while the new traffic signals are installed.

  • ONGOING: The contractor is installing stop foundations and canopies and poles for the overhead contact system (OCS) in the downtown area along Congress Street and Broadway. Officers will be on site to direct traffic during this work.

  • ONGOING: The existing traffic signals have been removed from the intersection of Broadway and Sixth Avenue.
  • A temporary three-way stop is in place at the Broadway and Sixth Avenue intersection. This temporary traffic control will be in place while the new traffic signals are installed.

  • ONGOING: North and southbound Church Avenue, at Broadway, has been reduced to one travel lane in each direction.
  • Because of the location of the work and restricted lanes, large trucks will not be allowed to turn at the intersection.
  • North and southbound crosswalk access will be shifted from the east and west side of the Church Avenue and Broadway intersection as work progresses through the area.
  • East and westbound crosswalk access will be maintained along both sides of the Broadway and Church Avenue intersection.
  • Parking will not be allowed along the east side of Church Avenue, between Broadway and Jackson Street.

Fourth Avenue and University Boulevard

This area of the project includes 4th Avenue from the 4th Avenue underpass to University Boulevard, University Boulevard to Main Gate Square, and Park Avenue to 2nd Street. Traffic control in this area is as follows:

  • No ongoing construction related activities are occurring along Fourth Avenue or University Boulevard at this time.

U of A and Health Sciences Center

This area of the project includes Second Street to Warren Avenue, the Warren Avenue underpass and a section of Helen Street that connects to the Health Science Center. Traffic control in this area is as follows:

  • ONGOING: The intersection of Warren Avenue and First Street has been closed to allow the contractor to complete the removal of the existing roadway, underground utility work, rail placement and installation of the Overhead Contact System. This closure will be in place through July, 2013.

  • ONGOING: Helen Street, between Warren and Martin Avenues, is closed.

  • ONGOING: The Warren Avenue Underpass closure is expected to be in place through July 2013, while the contractor completes the removal of the existing roadway, underground utility work, rail placement and installation of the Overhead Contact System. Detour signs will be in place to help direct pedestrian and bicycle traffic through the area.

The construction activity information in this update is subject to change at any time. If you wish to be removed from this e-mail list, please use the unsubscribe link at the bottom of this message.